    PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E     WED, MAR 30 2022  16:38
BASE DE DATOS DE EL SALVADOR
DEMANDA MAXIMA NOCTURNA 1SEM 2023

BUSES WITH VOLTAGE GREATER THAN 1.0500:

  BUS# X-- NAME --X BASKV AREA  V(PU)  V(KV)      BUS# X-- NAME --X BASKV AREA  V(PU)  V(KV)

                                           * NONE *


BUSES WITH VOLTAGE LESS THAN 0.9500:

  BUS# X-- NAME --X BASKV AREA  V(PU)  V(KV)      BUS# X-- NAME --X BASKV AREA  V(PU)  V(KV)

                                           * NONE *
    PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E     WED, MAR 30 2022  16:38
BASE DE DATOS DE EL SALVADOR
DEMANDA MAXIMA NOCTURNA 1SEM 2023
                       OUTPUT FOR AREA 2 [EL SALVADOR ]
SUBSYSTEM LOADING CHECK (INCLUDED: LINES; BREAKERS AND SWITCHES; TRANSFORMERS) (EXCLUDED: NONE)
CURRENT LOADINGS ABOVE 100.0 % OF RATING:

X--------- FROM BUS ----------X X---------- TO BUS -----------X               RATING SET A    RATING SET B    RATING SET C
  BUS# X-- NAME --X BASKV  AREA   BUS# X-- NAME --X BASKV  AREA CKT LOADING  RATING PERCENT  RATING PERCENT  RATING PERCENT

                                  * NONE *